Gallery
Hannibal site view during power plant construction – boiler (HRSG) erection
Preparing to offload 614 MVA generator from on-site loop track
Site overview during power plant construction, looking southeast
Site overview during power plant construction, looking northeast
Site overview during power plant construction, looking east
Construction progress - circ water pumps and building steel
Construction progress - cooling tower chem feed area, 11,000-ton crawler crane used for HRSG modules
Power plant construction – HRSG and pipe rack activities
Power plant construction – combustion turbine air inlet, pipe rack, turbine building
Power plant construction – turbine building interior – condenser, steam turbine, generator, lube oil system
Power plant construction – west side of HRSG
Power plant construction – placing top section of exhaust stack at 223 feet above site elevation
West side of completed HRSG, looking south. Combustion turbine fuel gas skids at lower left
Turbine building interior with combined lube oil system at ground level and equipment pedestals supporting (near to far) steam turbine, generator, and combustion turbine
Adjacent 138,000 volt grid interconnection constructed by Long Ridge
Power plant nearing completion – aerial view looking west
Control room operations, 24/7/365
NAES technicians adjusting hydrogen fuel blending system components
Catwalk at the Ohio River to cooling water intake
Power plant operations – looking north – showing continuous emissions monitoring equipment enclosure at the base of the stack
Power plant operations – looking east showing Isophase bus ducts to step-up transformer
Power plant aerial view – looking east, showing Ohio River infrastructure and sand barge operations
Power plant operations – looking west across cooling tower to HRSG, pipe rack, and turbine building